CS Energy
Treating particulate-heavy dam water for industrial use at the Kogan Creek site. A multi-pass Purus trial achieved a 93% reduction in particulate load, with an estimated operating-cost improvement of up to about 10%, largely from reduced fouling of downstream RO membranes.
Samples analysed by ALS